Haul Out Form

Haul Out Form

Boat Information

* Please call the service department to schedule an owner present haul out.

Service Work

*Fresh water systems that require more than 1.5 hours of labor to winterize may incur additional charges. Please drain fresh water tanks to reduce chance of overages.
* Engine Oil Changes must be submitted by 9/16 in order to guarantee completion this fall.

VIB

Winterization services were not included in VIB contracts. Payment on winterization will be due on or before 12/12/18. If the boat is not being stored by GBM, payment for haul out & winterization services is due prior to boat leaving.
I hereby authorize the repair work listed above to be complete along with any necessary materials. The right is reserved by Gem Beach Marina, Inc. to substitute parts for those currently unavailable. Gem Beach employees may operate the vessel herein on the waterways or elsewhere for the purpose of testing, inspecting or delivery at my risk. An express maritime/merchandside lien may be asserted on the above vessel to secure payment of repairs thereto. All invoices must be paid in cleared funds before the boat is released. Owner acknowledges that Owner has received, read, understands and agrees to abide by these terms and conditions. It is the owners responsibility to make sure all information is complete and accurate. Typed or Electronic signatures are valid and binding.

Gem Beach Marina, Inc.3000 N. Carolina Street
Port Clinton, OH 43452
Rt. 53 N, Catawba Island
phone: 1(419) 797-4451
email: info@gembeach.com